>> From the agency. Most of Rail Tracks maintenance staff is from contractors.
Who then allow work to be sub and sub sub contracted. Numerous RAIB reports evidence the pee poor adherence to H&S of these people.
Agency staff doing their stuff on the Permanent Way are not likely to be an immediate fit for the ticket office or barrier line, never mind conductor/guard.
|