I have one quote electronically here, so pasted as follows:
For erecting 2no. scaffolding towers enable safe working access. This is a requirement of the HSE.
Both to be erected around chimneys.
For stripping off the tiles and set aside for re-use from around both chimneys.
For carefully knocking off the mortar .
For cutting into the brick work new chase to take new step and cover flashings.
For supplying new BS code 4 lead which is fitted into the new brick chases..
For re-tiling in the tiles taken off around the chimney, replacing any we feel not suitable for re-use.
For dressing over new lead work onto the tiles complete.
For dressing into the wall new lead wedges.
For re-pointing the chase in which the lead is returned into neatly, ensuring a good strong mix of mortar.
For checking around the chimney and re-flunch tops complete.
For clearing away all debris from the above property leaving clean and tidy as found.
A little negotiation has resulted in 2,300.00 + VAT