It will be a complete re-build Crankers incorporating at least 1No. code 5 lead tray within. The mortar fillet is an amateur method. Lead soakers OVER the tiles and stepped lead flashing to the sides. If it were local to me say 2.5 -3k depending on factors. All plus v.a.t. sadly. Hope this helps.
|