Last summer they were meant to totally resurface a road near us. Just before the end of the summer holidays nothing had happened and there must have been a good 1.5 - 2 miles to cover. Then one Sunday morning they'd done a fair old chunk.
Had they lift the old surface... no. They had laid about 10mm of asphalt on top of everything including drains that needed cutting out later. I bet that doesn't last either.
Last edited by: welshy on Sat 27 Feb 10 at 08:14
|