>> What they have opened is but a small part of the overall plan. It is
>> seriously late and seriously over budget.
>>
>> It demonstrates either a complete lack of ability to plan major projects, or a similar
>> level of incompetence when it comes to actual delivery.
Not restricted to the UK, Berlins new airport is an eye watering example of appaling major infrastructure delivery.
TBF the mayor tricky part of the Lizzy line, the tunnels, was delivered more or less much on time and to budget. Signaling however has been a nightmare, no-one considered the complexity of integrating automated trains with non automated infrastructure on the interconnecting existing lines.
|